Clean Water Well Installation Project
Bangladesh · Directed by HWO
Funds raised: ৳100,000
Description:
This video documents the step-by-step construction and inauguration of a new tube well water pump project in Rangpur (April 2026), established as a Sadaqah Jariyah (continuous charity) sponsored for Ali Hazazi.
Key Construction & Installation Stages:
Site Selection: Identifying and clearing the suitable installation location.
Well Drilling & Water Extraction: Manual boring into the ground to reach clean water.
Piping Installation: Inserting durable PVC pipes into the deep borehole.
Pump Assembly: Installing the green manual hand-pump mechanism.
Concrete Foundation & Tiling: Building a sturdy, paved concrete platform and drainage channel around the pump.
Painting & Finishing: Painting the base with protective teal and maroon sealant coatings.
Inauguration & Community Access: Testing fresh water flow, sharing clean drinking water with local children, and offering prayers with community members celebrating access to clean water.