Clean Water Well Installation Project

Bangladesh · Directed by HWO

Funds raised: ৳100,000

Description:

This video documents the step-by-step construction and inauguration of a new tube well water pump project in Rangpur (April 2026), established as a Sadaqah Jariyah (continuous charity) sponsored for Ali Hazazi.

Key Construction & Installation Stages:

Site Selection: Identifying and clearing the suitable installation location.

Well Drilling & Water Extraction: Manual boring into the ground to reach clean water.

Piping Installation: Inserting durable PVC pipes into the deep borehole.

Pump Assembly: Installing the green manual hand-pump mechanism.

Concrete Foundation & Tiling: Building a sturdy, paved concrete platform and drainage channel around the pump.

Painting & Finishing: Painting the base with protective teal and maroon sealant coatings.

Inauguration & Community Access: Testing fresh water flow, sharing clean drinking water with local children, and offering prayers with community members celebrating access to clean water.

Support projects like this